Challenging the “Norm” – Process Engineering Q&A with Norm Goldschmidt

Seeking answers regarding your biomanufacturing operations? Look no further. Our President, Norman Goldschmidt, is answering your questions regarding sterility, safety, quality, and efficiency. If you have one for us to post, please use the form below and reference “Challenging the Norm.”

Norman Goldschmidt, President of Genesis AEC, spent two decades at Bristol-Myers Squibb, most recently as Executive Director of Global Engineering. He holds four patents, serves as an ISO Author/Expert, and contributes to ISPE, ASHRAE, NSF, FDA, HCA, and TGA. In this recurring series, he answers real-world questions on sterility, safety, quality, and efficiency in biomanufacturing facilities.

Question: In sequential airlocks, should gowning occur in the lower-class space or the target cleanliness class?

Answer: It depends on your Environmental Monitoring (EM) philosophy, but gowning is typically best performed in the lower-classified space (e.g., Grade C before entering Grade B). High-particle activities—such as pulling coveralls over scrubs—naturally liberate particles. In small airlocks, gowning directly in Grade B risks triggering brief EM breaches near the cleanroom entrance. Performing the initial gowning stage in Grade C minimizes particle spikes in both spaces. If your EM program explicitly accounts for temporary particle spikes on the "dirty side" of a Grade B airlock, completing all gowning inside Grade B is acceptable.

Question: During an Aseptic Process Simulation (APS), should units removed during an intervention be filled and incubated, or cleared?

Answer: Under EU GMP Annex 1, you are not required to fill or incubate units removed during an intervention, provided your production SOPs mandate clearing those exact units during routine runs. Discarded units must strictly mimic routine production clearing (such as set-up discards or specific glove interventions). If you choose to fill and incubate these cleared units, do so separately to evaluate process robustness; they do not need to count against your primary APS acceptance criteria.

Question: What is the current standard for Controlled Not Classified (CNC) space, and who defines it?

Answer: CNC is an industry-derived designation rather than an official FDA or EU regulatory classification. It defines non-classified spaces (often termed "pharmaceutical clean" or "Gray space") designed to buffer ambient areas from ISO 8 environments.

According to the ISPE Baseline Guide (Biopharmaceutical, 2nd & 3rd Editions):

  • Function: CNC housing is intended for closed processes and their support systems.
  • Environmental Control: It provides temperature and humidity control with filtered airflow (MERV 13 or better), but makes no specific claim for particulate cleanliness levels.
  • Access & Operations: Access is controlled, rooms are cleanable, and optional garment upgrades remain at the facility owner's discretion.

Question: Does the WHO require open RABS (oRAB) for ophthalmic filling lines to have a dedicated AHU and top-mounted fresh air supply?

Answer: No. Neither WHO TRS 1044 Annex 2 nor TRS 961 Annex 6 mandates a dedicated AHU or top-mounted fresh air supply for oRABS on ophthalmic lines. Air handling effectiveness is governed by ISO 14644 cleanroom standards. Recirculating and filtering room air that is already clean is standard practice; connecting active RABS to low-wall room returns has been a proven, effective design strategy for decades.

Question: Our intervention procedure states that the line must be cleared of open vials by the filling machine before an intervention, whenever possible. During an intervention, vials are removed if first air is interrupted or units are overlaid by the isolator glove. What is the recommended approach for aseptic process simulation interventions involving isolator gloves, specifically regarding the presence of open vials on the line? Should units be filled after the intervention, ensuring the line is cleared during the intervention, or is it acceptable for open units to be present on the line during the intervention, and subsequently filled with media to qualify for the intervention?

Answer: Under EU GMP Annex 1, you are not required to fill or incubate units removed during an intervention, provided your production SOPs mandate clearing those exact units during routine runs. Discarded units must strictly mimic routine production clearing (such as set-up discards or specific glove interventions).

Specifically, guidance emphasizes the following rules:

  • Incubation Baseline: All integral units from the APS should be incubated and evaluated, including units with cosmetic defects or those processed through non-destructive in-process control checks.
  • Routine Parity: Units discarded during a simulation must strictly correspond to units discarded during routine production runs.
  • SOP Alignment: Removal is only permitted if production SOPs specify that units must be removed under identical circumstances (e.g., intervention type, line location, and exact count).
  • Clearance Limits: No more units should be removed during an APS intervention than would typically be cleared during routine operation.
  • Separate Risk Assessment: To assess contamination risks during setup or mandatory line clearances, discarded units may be incubated separately and excluded from the main APS acceptance criteria.

Because non-integral units removed during your intervention represent standard routine discards, you are on solid ground to neither fill nor incubate them. Choosing to do so separately serves primarily to validate process robustness rather than satisfy a mandatory pass/fail metric.

If you have a question, please use the form below and reference "Challenging the Norm" and we'll post the answer here, or if you prefer, reach out to you personally.

About Genesis AEC

Genesis AEC – an award-winning consulting, architecture, engineering, and construction management firm – has partnered with life sciences companies for more than 25 years to complement the scientific expertise of our clients as they usher in the next generation of life-saving therapies, treatments, and technologies. Whether it’s providing AE support for existing sites; commissioning, validation, and qualification (CQV) for specific processes or equipment; or turnkey design-build solutions, our team blends sound science and technical expertise with quality assurance and safety measures to deliver unparalleled results.